The new building replaces the former approximately 390 m long Prerow sea bridge, which was dismantled for the project. In addition, an island harbour with a usable area of approx. 10,000 m² will be built, which has an elegant teardrop shape. It will take over the function of the emergency port of Darßer Ort, which will be closed and restored. In addition to its main function as an emergency port, the new island port with up to 45 berths will ensure the compaction of the sports port network, for example for sailing, and have a passenger dock. The inauguration and commissioning of the construction project, which has been underway since 2022, is planned for the summer of this year. The developer is the state of Mecklenburg-Western Pomerania, represented by the State Office for Agriculture and Environment of Central Mecklenburg.
A professionally designed steel railing compliant with approvals from the commissioned company Norcons GmbH from Sundhagen protects people and infrastructure on the sea bridge. To anchor the railings in the construction of prefabricated concrete parts on foundation pipes, the shipbuilding, industrial and steel construction specialists of Norcons GmbH used a chemical fastening system from fischer, which has a European Technical Assessment (ETA) for the application.