Heavy traffic, narrow and winding roads and potential dangers such as storms and forces of nature place high demands on the safety of the Gotthard Pass Road. Under the leadership of the German Federal Roads Agency ASTRA, construction planners and contractors have been able to master the renovation under these difficult conditions precisely on schedule. At the same time, the sophisticated project management of ASTRA regulates the continued flow of traffic on the important link between the north and south of the Alps.
Since 2017 April the renovation of the Tanzenbein (middle and south sections) and Brüggwaldboden galleries as well as the Fadegg tunnel has been planned. These devices protect road users from stone chipping, rock falls and mainly from avalanches. The existing roof has been reinforced to increase the safety of the Dance Leg Gallery. For this purpose, 1,900 fishermen’s FCC-A concrete-to-concrete push fasteners, consisting of anchor rod and special nut, were used on 250 square metres. The axle spacing was 25 and 35 centimetres to each other, depending on the direction. First, the concrete builders of the responsible construction company Implenia drilled holes in the old concrete to the specified dimensions. After careful cleaning of the borehole, they filled it with the 2-component injection mortar FIS V. They then manually inserted the FCC-An into the injection mortar up to the bottom of the borehole. After a short hardening time, these fasteners are fully resilient and now absorb and reliably transfer the tensile and shear forces that occur in the joint between old and new concrete.